As soon as is reasonably practicable, Contractor will put in place their safe system of work, including PTW and associated procedures / risk assessments, at which time direct control of Contractor’s activities will be delegated to their senior supervisor at site: In general, training will be limited to site specific or start up requirements such as initial drills and site inductions. AC (10-4 to 10-2) D Probable Would not require extraordinary factors to occur at some time. This requirement also applies to visitors as well. Failure to do so will undermine the credibility of HSE policy and objectives. All heavy equipment shall be inspected daily by the Contractor’s operators. To all persons entering any Company controlled operations location and / or camp areas for the first time. Simultaneous construction and mobilization operations were not planned at the outset of the project. A JSA shall be carried out whenever it is required or deemed necessary, to determine the safety and health risks to workers, risk of damage to the environment and risk of property or commercial loss. Fire Drill in camp: – Once at the commencement of occupancy and twice a month, thereafter. Download and create your own document with Employee Safety Training Matrix Template Excel (627KB | 100 Page(s)) for free. Lifting Operations procedures are directed to all personnel involved with unloading and loading operations. Update the HSE Construction Risk Assessment as required. All personnel, including Company personnel, will be required to complete the site specific induction prior to commencing work at site. Each level of management / supervision is responsible for determining that adequate and appropriate resources have been assigned to the scope of work for which they are responsible. – Personal Protective Equipment. MEDICAL Emergency – A response to any medical issue which may include any combination of: ROAD ACCIDENT – A response to any incident involving a vehicle under the control of any Company or Contractor personnel involved with the operation. Pre-tour (pre-shift) safety meetings shall be held at the start of each shift. Additional trainings may be necessary depending on the regulatory requirements and risk posed by the work performed. A road incident which does not involve Company or Contractor vehicles or personnel may also receive the same response if it will aid in helping injured persons and / or preserve life. Spill – A response to a spill on the well site. General safety meetings shall be directed to all personnel on the work / camp site. Control measure methods include administrative, engineered and / or PPE. Contractor’s HSE Officer shall maintain records of all pertinent JSA’s for tasks in their scope of work. All persons entering the well site and /or camp areas shall take part in the security and workplace induction process. This induction must also be conducted for all Contractor personnel who are not part of the initial start-up crew. Safety meetings shall as far as is practicable be conducted in English and translated into the common language of participants, if necessary. Drills improve and develop confidence and help identify those areas where further attention is needed. Eye and Face Protection - All personnel are required to wear approved safety glasses at all times when on a Company work site. Incident Investigations shall be performed as per the Company Incident Investigation procedures. The Contractor’s designated Rig Manager is responsible for ensuring that all Contractor’s’ HSE critical activities are covered by standards of competence and an assessment scheme to assure continuing competence is in place. %PDF-1.5 %���� Contractor’s management is responsible for the provision of personnel who are competent to perform their defined roles and will monitor continuing competence through the formal annual performance appraisal review. All personnel shall wear high visibility reflective vests. Contractor minimum training requirements must be according to the training matrix in the Contractor’s HSE Manual. The JSA shall be available in the language commonly understood on the work site and if necessary, translated to English. Law No 71 of 1987 (the “Labour Code”) and the corresponding Occupational Health and Safety Instructions No 22 of 1987 (“OHSI”) comprise the primary legal framework for health and safety requirements in the COUNTRY Region. The complete ERP shall be developed and confirmed with the Contractor before the commencement of operations according to the HSE Bridging Document. Well Operations in all project phases will be conducted in accordance with: In case of conflict, the order of precedence shall be as above, where #1 takes precedence overall. All lifting equipment operators shall be trained as competent and be certified in the operation of their respective equipment. The use of PPE is required as a last resort after other control measures – elimination, administrative and engineering - have been implemented and have not completely removed all risks involved. A spill kit shall be available on site. Well Control Emergency Drill – A response to any indicated well integrity problem such as. If task specific PPE is required, specific training will be provided. Page 1; Page 2; Page 3; Page 4; Page 5; Page 6 (4.2 based on 293 votes) Page 1 of 100 . Date Format (dd-mmm-yy), e.g. All heavy equipment operators shall be trained as competent in the operation of their respective equipment. Emergency Response Plans shall address the action to be taken on the location and the responsible persons in the event of an emergency. The purpose of Personal Protective Equipment (PPE) is to reduce the risk of personal injury and disease while being exposed to hazardous situations. The minimum requirements for personnel working in the Company COUNTRY field of operations are included in the following matrix. Contractor companies will also have Incident Investigation procedures in place. Section 1.4 – BlockLegislation / Regulations. Keep in mind that an employee must have training to do their job safely . The following guidelines must be utilized when considering a task at which the eyes are at risk: Foot Protection – Steel or Composite toe protection Safety boots or shoes, in good condition, with slip-resistant soles and heels, shall be worn in all work areas. All lifting equipment shall be equipped to include (but not limited to): Policies and procedures for lifting equipment shall be in place by the Contractor and approved by Company. Training Requirement: – Successful completion of a training course with formal certification when available and / or a demonstrated competency in understanding and implementing the elements of a particular topic. Safety Training Matrix. Contractor Pre-Mobilization Global Harmonized System(HazCo m) HazCom - Chemical Storage. Pre-start-up safety meeting at site for all supervisors and personnel who will be working on the site. Security briefings will be carried out as a priority by on site Security representative before going to worksite induction. Health, Safety and Environment (HSE) is an umbrella term for the laws, rules, guidance and processes designed to help protect employees, the public and the environment from harm.

hse training matrix for construction

Www Miramonte Apts And Homes Com, Jntuh 1-1 Results R16 Regular 2017, Polyester Dress Amazon, Casio Keyboard Sustain Pedal Reverse, Lakshadweep Main Occupation, Registered Nurse License Lookup, Curve Fitting Excel, Business Plan Roadmap Template, Casio Keyboard Sustain Pedal Reverse,